Mestre: Maintenance Works at the Terraglio Railway Underpass and Bus Route Modifications

AVM/Actv informs that, from 9:30 AM on Tuesday, August 18, until the end of service on Thursday, August 20, 2026, due to roadworks on the Via Terraglio railway underpass, buses on lines 8E, 8AE, 12E, and 31H heading towards Mestre will follow the diverted route described below:

  • Coming from Terraglio towards Mestre/Venice: Buses will turn onto Via S. Damiano, Via S. Chiara, and Via Castellana, resuming their regular route from the Via Circonvallazione roundabout.
  • Coming from Mestre towards Treviso: Buses will follow their regular route.

Violent Assault on ACTV Sailor Sparks Security Outrage on Ferragosto

Another alarming incident of violence has hit Venice’s public transit system, leaving a frontline worker hospitalized following a brutal confrontation on the waterbus network.

What Happened on Ferragosto

On the afternoon of Ferragosto, a 50-year-old crew member (sailor) working for ACTV became the target of a violent physical assault while on duty aboard a vaporetto. The altercation reportedly erupted following a dispute over standard travel rules.

Rather than resolving the disagreement peacefully, the situation rapidly escalated into physical violence. The worker sustained serious injuries during the attack, including a bruised jaw and a compromised eardrum, requiring urgent medical transport to the hospital.

Growing Safety Concerns for Transit Workers

This unprovoked attack has reignited fierce discussions among transport unions and workers regarding passenger civility and frontline safety. Unions have strongly condemned the aggression, pointing out that public transit personnel face increasing hostility and demanding immediate intervention.

In response to the incident, worker representatives are once again calling on local authorities and ACTV management to implement stricter security protocols and establish a permanent security presence on board vaporettos. As investigations continue to identify the perpetrator, the attack serves as a stark reminder of the safety challenges facing the workers who keep Venice moving every day.

Venice: Suspension of the Crea Stop

AVM/Actv announces that, due to urgent maintenance work, from 9:00 AM to 2:00 PM on Tuesday, 25 August 2026 (and in any case until the work is completed), the Crea stop will be suspended.

During the suspension, lines 4.1 and 4.2 will make a substitute stop at the nearby Tre Archi stop.

  • Last regular run of line 4.1: 8:47 AM
  • Last regular run of line 4.2: 8:48 AM
  • First passage of line 4.1 at Tre Archi: 9:07 AM
  • First passage of line 4.2 at Tre Archi: 9:08 AM

Lido Alberoni: Festa del Peocio (Mussel Festival)

πŸŽ‰
Event & Transport Alert

Lido Alberoni: Festa del Peocio (Mussel Festival)

AVM/Actv announces that from Thursday 20 to Sunday 23 August 2026, traffic on Via Ca’Rossa will be altered for the “Festa del Peocio” (“Mussel Festival”). Buses on the affected routes will follow these detours:

Daytime Service β˜€οΈ

From Midnight to 6:00 PM

  • Coming from Faro Rocchetta/Alberoni Beach: At the Via Ca’Rossa/Strada della Droma junction, buses continue onto Strada della Droma and then Via Alberoni, rejoining the normal route from there.
  • Coming from Malamocco: Normal route, no changes.
Evening Service πŸŒ™

From 6:00 PM to Midnight

  • Coming from Faro Rocchetta/Alberoni Beach: Same detour as above β€” via Strada della Droma to Via Alberoni, then back onto the usual route.
  • Coming from Malamocco: Buses travel via Via Alberoni, Strada Vecchia dei Bagni, and Strada della Droma, rejoining the regular route at the Via Ca’Rossa junction.
🚌

Temporary Stop Changes: During the event, Line 11 buses will pick up and drop off passengers at the Alberoni Chiesa and Malamocco Centro stops, and a new pair of stops will be added on Strada dei Bagni.

AVM/Actv announces that from Thursday 20 to Sunday 23 August 2026, traffic on Via Ca’Rossa will be altered for the “Festa del Peocio” (“Mussel Festival”). Buses on the affected routes will follow these detours:

From midnight to 6:00 PM

  • Coming from Faro Rocchetta/Alberoni Beach: at the Via Ca’Rossa/Strada della Droma junction, buses continue onto Strada della Droma and then Via Alberoni, rejoining the normal route from there.
  • Coming from Malamocco: normal route, no changes.

From 6:00 PM to midnight

  • Coming from Faro Rocchetta/Alberoni Beach: same detour as above – via Strada della Droma to Via Alberoni, then back onto the usual route.
  • Coming from Malamocco: buses travel via Via Alberoni, Strada Vecchia dei Bagni, and Strada della Droma, rejoining the regular route at the Via Ca’Rossa junction.

During the event, Line 11 buses will pick up and drop off passengers at the Alberoni Chiesa and Malamocco Centro stops, and a new pair of stops will be added on Strada dei Bagni.

Vigonovo: Bridge Closure

AVM/Actv announces that from 9:00 AM on Tuesday, August 18 until 6:00 PM on Friday, August 21, 2026, the bridge over the Brenta river on the SP 17 will be closed, resulting in the following changes to line 55E:

  • 5:10 Calcroci – Vigonovo: trip cancelled.
  • 5:30 Vigonovo – Dolo: upon reaching the roundabout in the center of Vigonovo, the bus turns around and continues via P.za Marconi and Via Dante; at the intersection with Via Noventana it detours via Via Oltre Brenta, then through San Pietro di Stra via Via Roma, Via Chiesa, and Via Battisti, rejoining the normal route from Via Trieste.
  • 5:42 – 6:15 Dolo – Celeseo: trips cancelled.
  • 6:20 – 6:45 Celeseo – Dolo: upon reaching the roundabout in central Vigonovo, continues via P.za Marconi, Via Dante; at the Via Noventana intersection continues via Via Oltre Brenta, through Stra via Via Roma, Via Chiesa, Via Battisti, rejoining the normal route from Via Trieste.
  • 6:35 – 8:10 – 10:35 – 12:50 – 14:30 – 16:25 – 17:05 – 17:45 – 19:25 Dolo – Stra: at the Galta turnoff, continues via SP17, Via Battisti, Via Roma to reach the terminus.
  • 6:40 Calcroci – Padova: at the Galta turnoff, continues via SP17, then at the roundabout via Via Battisti, Via Roma, Via Oltre Brenta, rejoining the normal route from Via Noventana.
  • 7:38 Dolo – Padova: at the Galta turnoff, continues via SP17, then at the roundabout via Via Battisti, Via Roma, Via Oltre Brenta, rejoining the normal route from Via Noventana.
  • 7:15 – 8:45 – 11:15 – 13:25 – 15:10 – 17:07 Stra – Dolo: departing from the terminus toward San Pietro di Stra, Via Roma, Via Chiesa, Via Battisti, then at the Galta roundabout continuing via Via Battisti, and at the next roundabout via Via Pava, rejoining the normal route.
  • 7:50 Padova – Dolo: upon reaching Via Noventana, continues toward Stra, San Pietro di Stra, Via Roma, Via Chiesa, Via Battisti, then at the Galta roundabout via Via Battisti, and at the next roundabout via Via Pava, rejoining the normal route.
  • 13:55 – 15:20 – 17:20 – 18:20 Dolo – Celeseo: at the Galta turnoff, continues via SP17, then at the roundabout via Via Battisti, Via Roma, Via Oltre Brenta, Via Dante, then Vigonovo and on to Celeseo.
  • 14:25 – 19:45 Padova – Calcroci: upon reaching Via Noventana, continues toward Stra, San Pietro di Stra, Via Roma, Via Chiesa, Via Battisti, then at the Galta roundabout via Via Battisti, and at the next roundabout via Via Pava, rejoining the normal route.
  • 14:25 – 15:50 – 18:50 Celeseo – Dolo: trips cancelled.

All trips not listed above run as normal.

Buses starting or ending in Celeseo will still stop at Vigonovo center; no other diversion stops will be made, except for the stops on Via Battisti in Galta. In addition, a temporary pair of stops will be set up near roundabout 21 on the SP17.

Lido – 83rd Venice International Film Festival: Changes to Bus and Ferry Services

AVM/Actv announces that, starting with the first services on Monday 17 August and running through Saturday 12 September 2026, transport services will be adjusted because of the 83rd International Exhibition of Cinematographic Art organized by the Fondazione La Biennale di Venezia. Updates will be posted on this page as they become available.

FERRY SERVICES

  • Updates coming soon.

BUS SERVICES

From the start of service Monday 17 August through the end of service Monday 31 August 2026

Because Piazzale CasinΓ² at the Lido will be closed to traffic, Lido bus routes will be adjusted as follows:

Line CO (Hourly Loop):

  • Route suspended.

Line C – daily schedule restructured:

  • Departures from Ca’ Bianca toward SME, running 07:17–15:17 at :17/:37/:57, are suspended.
  • Departures from SME toward Ca’ Bianca, running 15:23–19:43 at :03/:23/:43, are extended to reach Via Parri.
  • Trips running only between SME and SME remain unchanged.

Line CA (Counterclockwise Loop):

  • Route change: departs SME via Via S. Gallo – Via Colombo – Lungomare Marconi – Via Emo – Via S. Gallo, returning to SME.
  • Times: 08:06, 08:26, 08:46, then 09:06–19:56 at :06/:16/:26/:36/:46/:56.

Line V (Film Festival service):

  • Outbound from SME: Gran Viale – Lungomare Marconi – Via Lorenzo Marcello – Via Dardanelli – Via Quattro Fontane (terminus), then return via Via Quattro Fontane – Lungomare Marconi along the same route in reverse.
  • Departures from S. Maria Elisabetta (SME 4): 08:03, 08:23, 08:43, then 09:03–20:03 at :03/:13/:23/:33/:43/:53.
  • Departures from Via Quattro Fontane: 08:14, 08:34, 08:54, then 09:14–20:14 at :04/:14/:24/:34/:44/:54.
  • Departures from Via Parri to S. Maria Elisabetta (via Via Malamocco – Lungomare Marconi – Via Emo – Via S. Gallo): 15:38–19:59 at :18/:38/:58.
Vaporetto Pass
⭐ 4.5 (4131 reviews)
from €12.00 / person
  • All Vaporetto Lines Included
  • Murano, Burano, Lido
  • Valid 24h to 7 days
  • Instant Mobile Voucher
Book Vaporetto Pass

Children under 6 years old: Free

Vaporetto Pass from €12.00 Β· ⭐ 4.5
Buy Ticket